UK Site Welding Banner
 

Portfolio

Tynes Replaced and Modified Using CAT GET Big bucket repairs High capacity sump modifications Finished item
Tynes Replaced & Modified Using CAT GET Big bucket repairs High capacity sump modifications Finished item
Brass flywheel housing for petrochemical generator Finished product Muncher re-builds All hardox teeth used
Brass flywheel housing for petrochemical generator Finished product Muncher re-builds All hardox teeth used
Finished half Alloy Tanker Repairs CAT D8 trunnion ends This was a Boom that was extended by 1 metre we put it back to std
Finished half Alloy Tanker Repairs CAT D8 trunnion ends This was a Boom that was extended by 1 metre we put it back to std
New bucket tip frames fabricated Generator in prep Site damaged Finished product
New bucket tip frames fabricated Generator in prep Site damaged Finished product
Guards fabricated and fitted Rippers fabricated Axle pedestals changed
Guards fabricated and fitted Rippers fabricated Axle pedestals changed
Komatsu D55 beam repaired Bucket lips and teeth fitted Fully equipped 4x4 van and a pick up for delivering A very confined space
Komatsu D55 beam repaired Bucket lips and teeth fitted Fully equipped 4x4 van and a pick up
for delivering
A very confined space
Night repairs carried out on railway 
						bridges Chassis fabricated to your drawings 1 off's (stainless expansion foam 
						inserter for concrete) Grab before "It was well worn out"
Night repairs carried out on railway bridges Chassis fabricated to your drawings 1 off's (stainless expansion foam inserter for concrete) Grab before "It was well worn out"
Workshop repairs carried out up to 4 
						tonnes Aluminium platform cages repaired Internal damage caused problem All prepped and backing strips used 
						as specification states
Workshop repairs carried out up to 4 tonnes Aluminium platform cages repaired Internal damage caused problem All prepped and backing strips used as specification states
Finished product painted Bucket wear plates On site pipe work carried out Quick release modifications
Finished product painted Bucket wear plates On site pipe work carried out Quick release modifications
Line Boring carried out at London Docks In line boring carried out "The bores were well worn" Bores filled with weld old boss S/Steel Guards
Line Boring carried out at
"London Docks"
In line boring carried out
"The bores were well worn"
Bores filled with weld
 to build up the old boss
S/Steel Guards
Excavator extensions Finished product painted Bucket frame finished Generator modifications
Excavator extensions Finished product painted Bucket frame finished Generator modifications
Finished job Screens fabricated Specialist manifolds Carrying frame ready to paint
Finished job Screens fabricated Specialist manifolds Carrying frame ready to paint
Safety walkways Tynes being cut out of 50mm Tensile 
						Steel Plate cutting service Oxy & Plasma cutting Dipper Arm bent & twisted Now repaired & strengthened
Safety walkways Tynes being cut out of 50mm Tensile Steel Plate cutting service
Oxy & Plasma cutting
Dipper Arm bent & twisted
Now repaired & strengthened
Terex Dipper repaired & painted
Terex Dipper repaired & painted







© Copyright UK SITE WELDING Limited 2011

Valid XHTML 1.0 Strict Valid CSS!